Case Studies

Back to homepage
Case Studies

Case Studies: Kaytech Solves Problem at Kazungula Bridge Project

The primary objective of building the multimillion dollar Kazungula Bridge was to link Zambia, Zimbabwe and Botswana in order to ease tourist traffic and enhance trade and integration between these

Case Studies

Case Studies: Extreme slope with AGRU HDPE geomembrane

Ischgl is an internationally renowned ski resort in the Silvretta Mountains in Tyrol. In order to guarantee absolute snow reliability, artificial snow-making is also required here. The new reservoir Viderböden

Case Studies

Case Studies: Kaytech’s Megaflo Chosen for SA Eastern Cape’s R56

April 2018 saw the commencement of a special maintenance project in the Eastern Cape, South Africa, where over 100 000 metres of Kaytech’s Geocomposite Megaflo Panel Drain System was used.

Case Studies

Case Studies: Securing Cavities Area by a very high Tensile Strength Geosynthetic Reinforcement

Problematic The sinkholes present a major problem in roads construction and urban development. The classical solutions used to limit the risk of cavities collapse are: filling of the void, construction

Case Studies

Case Studies: Roadway Reinforcement Applications

Application Subgrade Stabilization and Rein-forcement Job owner Iberdrola Renewables, LLC Location Hertford, NC Engineer Barr Engineering Product Mirafi® RSi-Series Contractor Wanzek Construction Quantity 205,000 yd2 – RS380i 120,000 yd2 –

Case Studies

Case Studies: Hybrid Sheet Piling – Fiberglass Rein-forced PVC Profiles

This case study shows how we introduced to the market new hybrid material to manufacture sheet piling that would bridge the gap between vinyl polychloride and steel. We present here

Case Studies

Case Studies: Kaytech Stabilises XtraSpace Storage Facility

In May 2017 Endecon Ubuntu Consulting Engineers contacted Kaytech for a solution on a differential settlement problem at a site in Centurion, Gauteng where a new branch of XtraSpace, a

Case Studies

Case Studies: Sunich Reinforced Green Slope Project (Iran)

Objective Sunich factory is one of the main production of fruit juices in Iran. At the moment, Phase 1 and Phase 2 of the Firouzkooh plant are in progress. Phase

Case Studies

Case Studies: Nuevo Aeroporto Internation de la Ciu-dad de Mexico (NAICM) – Runway 3

Client: CARGI-PROPEN SA DE CV Engineer: PARSONS & TASANA Main Contractor: GACM Subcontractor CETEAU BV / COFRA BV JV Scope of works • Production of more than 30 million linear

Case Studies

Case Studies: Detention Pond under the Freeway Over-pass, Taichung, Taiwan (R.O.C.)

Background Numerous typhoons swept across Taiwan during 2012 and 2013 bringing along abundant rainfall, leading mud flow and flooding to rolling and pouring down along the west side of Dadu